Due to the problems of freight and quantity, many farmers will choose to use the cement leakage plate mold to make by themselves. Compared with the finished products, it is certainly cost-effective to make by themselves, but in the process of making, there are still many farmers who can't do it. There are some problems such as the quality of the leaking board is not up to standard and it is difficult to demould.
During the production of cement leakage slab, there are several quality problems as follows: 1. There is no proper use of vibration platform or vibration platform. In the use of vibration platform, it is necessary to vibrate the concrete in the mold, and then lift the mold down. Some customers will choose not to use the vibration platform or make a vibration platform by themselves. The probability of doing well is not special Don't be big. 2. The construction and material cutting of the steel mesh, and the cement leakage slab mainly rely on the steel mesh. 3. If the placing time is too short, it shall be demoulded by force. 4. No watering for maintenance after demoulding.
There are two reasons for difficult demoulding: the first is to forget to spray the mould or waste engine oil in the mould. The second is the problem of mold. If the mold takes a long time, this problem will occur.
Although it is made by ourselves and can control the cost, it is also used by ourselves. The above is the reason why the problems often occur during the process of making the cement leakage board.