Service Hotline0373-4118088
Contact usSolve the problem of making cement leakage board
Authoe:hngjxmView:239
At present, the phenomenon of the cement leakage board made by the farmers themselves is gradually increasing. Although this phenomenon is gradually increasing, when making the cement leakage board, there will still be such phenomena as difficult demoulding of the leakage board and cracks in the leakage board. Here's how to solve the problem of making the cement leakage board.
One of the common problems is the difficulty of demoulding, which is caused by the problems of demoulding agent, too long use time of mould, problems of concrete mix, too long cooling time and so on.
The crack of cement leakage board is basically caused by the following reasons, and the combination of big sand, stone and cement is unreasonable. No special vibration platform is used in making the cement leakage board. When the cement leakage board is placed in the cool place, there is no tarpaulin, which causes the water to evaporate too fast. After demoulding, it is not watered for maintenance, so it can be used directly.
The above are the problems in the production of cement leakage board, which is also the basic reason for these problems. I hope it can help our friends.