Contact usHow to use the mold of the leakage board is easier to demould!
Authoe:hngjxmView:226
Although all parts of the country are using the leakage board mold now, the manufacturers have also conducted production guidance for pig farmers, but there are also many pig farmers who do not pay attention to the details during the production of cement leakage board, even if it leads to the difficulty of demoulding and mold deformation during the production of leakage board. This is also the response of our customers to our use.
First of all, the concrete must be well mixed. The concrete mix is based on the proportion of 1:2:3. The weight of the finished cement board is divided by 0.6m. Then, the mix is based on the proportion of Dasha 3, Shizi 2 and cement 1. The water volume is moderate. Put the mold on the 2.2kW vibration platform, and then spray the waste engine oil or release agent, preferably release agent. Put in corresponding double-layer reinforced mesh with thread reinforcement. Pour the concrete mixed in proportion into the mold in advance, and let the vibration platform vibrate the inside of the mold. Finally, put the mold in the open space, wait for it to solidify, the setting time depends on the local temperature, 24 hours in summer, 48 hours in winter. If you want to be in a hurry, you can lead in a heating pipe or a heat lamp below. When demoulding, it's OK to put the old tires on the bottom, and the mold can be demoulded perfectly with one button down. The last and most important step is not to use it urgently, but to spray water for maintenance for 3-7 days. And then put it into the pigsty,
The above is the specific process of mold production, hope to help you.